Top-Down Construction Method – ground level work (safety way of tank construction)
– the tank upper shell ring(top ring) and tank roof are constructed first
– each next successive tank shell rings are mounted using hydraulic jacks
– after installation of the last shell ring(bottom ring) the tank base is anchored on the concrete foundation.